Version comparison · v14 to v15

June model against May

Saved by Maya Chen, 12 Jun 2026
In review

6 inputs changed, 214 cells recalculated.

Total project cost
$66,500,000to$68,000,000
+$1,500,000+2.3%
Construction loan
$39,900,000to$40,800,000
+$900,000+2.3%
Levered IRR
18.20%to13.47%
−473 bps

Six inputs −442 bpsfinancing costs recalculated −31 bps

0 of 6 changes explained
6 of 6 changes still need a confirmed or recorded reason before sign-off.

IRR impacts are measured in the order the changes were saved, shown on each card, so they add up to −442 bps.

  1. 01

    Structural steel

    Maya Chen, 12 Jun, 3:41 pm
    was $3,612,000+$1,200,000
    IRR impact, measured in the order the changes were saved, so the impacts add up−132 bps
    Drafted reason
    Updated to revised GC bid, page 3, line 14
  2. 02

    Plumbing

    Maya Chen, 12 Jun, 3:44 pm
    was $2,140,000+$200,000
    IRR impact, measured in the order the changes were saved, so the impacts add up−22 bps
    Drafted reason
    Updated to revised GC bid, page 4, line 31
  3. 03

    Sitework

    Maya Chen, 12 Jun, 3:52 pm
    was $6,480,000+$185,000
    IRR impact, measured in the order the changes were saved, so the impacts add up−20 bps
    Drafted reason
    Added Change Order 03, page 1, line 9 (+$185,000)
  4. 04

    Loan spread

    Priya Raman, 12 Jun, 2:10 pm
    was SOFR + 3.25%+15 bps
    IRR impact, measured in the order the changes were saved, so the impacts add up−3 bps
    Drafted reason
    Updated to revised loan term sheet, page 2, line 6
  5. 05

    Hard cost contingency

    Maya Chen, 12 Jun, 4:02 pmNo source
    4.0%was 5.0%−100 bps
    IRR impact, measured in the order the changes were saved, so the impacts add up+48 bps
    Endovaasked in the thread

    No document in the folder supports this. What drove the change from 5.0% to 4.0%?

    Recorded against Hard cost contingency ·
  6. 06

    Exit cap rate

    Maya Chen, 12 Jun, 4:06 pmNo source
    5.50%was 5.25%+25 bps
    IRR impact, measured in the order the changes were saved, so the impacts add up−313 bps
    Endovaasked in the thread

    No document in the folder supports this. What drove the change from 5.25% to 5.50%?

    Recorded against Exit cap rate ·

Hardcoded inputs with no source

Unchanged since May, never sourced
  • Rent growth
    3.0%No source
  • Lease-up period
    9 monthsNo source
2/5The diff